Mon–Fri 9am–6pm · Deira, Dubai+971 55 134 6136sales@nice-venture.comView in Arabic · العربية
NICE Venture Information Technologies LLC logoNICE Venture Information Technologies LLCSecure Your Digital Transformation
Home / Projects / Sheikh Zayed University
Case study · Higher education · Abu Dhabi

Sheikh Zayed University, Abu Dhabi — 35,000 SYSTIMAX Cat6A Links Across a 24-Building Campus

A modern campus is a digital campus. Lecture capture, Wi-Fi in every corridor, secure labs, smart access and research networks all depend on one thing students never see: a structured cabling network built right.

Sheikh Zayed University — Structured Cabling Network by NICE Venture Information Technologies
35,000SYSTIMAX Cat6A cables terminated
24campus buildings
Fibrebackbone cabling laid
Accesscontrol field devices installed
The challenge

What had to work

A university campus has to carry teaching, research, administration, student life and security on one converged network — across dozens of buildings, thousands of rooms and a tight academic calendar. The cabling has to meet manufacturer warranty requirements so the network can grow for decades.

Our role

What we delivered

Working as the installation partner to the main contractor, NICE Venture terminated 35,000 SYSTIMAX Cat6A cables at the intermediate distribution frames onto patch panels, laid fibre backbone cabling between buildings, and installed access-control field devices across the 24 campus buildings.

Delivery

How the work was done

  1. 01

    Mobilise

    Teams organised by building and floor to keep pace with the campus construction programme.

  2. 02

    Terminate

    Cat6A copper terminated at the IDFs to SYSTIMAX installation practices and labelled for administration.

  3. 03

    Backbone

    Fibre cabling laid to connect buildings back to the core network.

  4. 04

    Secure

    Access-control field devices installed so the same infrastructure also protects the campus.

Outcomes

What was handed over

  • 35,000 Cat6A links terminated — the physical foundation for campus Wi-Fi, IP telephony, AV and security.
  • Fibre backbone laid between buildings, ready for high-bandwidth teaching and research traffic.
  • Access-control devices across 24 buildings installed on the same programme.
Technologies

What it runs on

CommScope SYSTIMAX Cat6AIDF patch panelsFibre backbone cablingAccess-control field devicesCable labelling & administration
Why it mattersEducation technology changes every few years; cabling stays for twenty or more. Getting Cat6A and fibre right at build stage is what lets a campus adopt new learning technology without opening ceilings again.

Planning a building, campus or resort network?

Tell us about your project. Our team in Dubai will reply within one business day with an approach, a delivery plan and the right technology partners.

Chat with us